BACK
Prefabricated Band Drain
CeTeau Prefabricated Vertical Drain (PVD)
Prefabricated band drain is widely used in reclamation to encourage consolidation by extracting faster water from the soft marine deposit to allow this layer to settle quicker. A few prominent projects are at Penny’s Bay, Kwai Chung Container Terminal and Hong Kong Zhuhai Macau Bridge.
Photo Reference